Jump to content

Got it!

MapLink™ Procedures | Supplemental Design, Installation and Maintenance Requirements

Hello! Content on this website is provided as a convenience and is for informational use only. Be sure to review the Terms of Use for all of the details related to your use of this website.
Accept
Back
Supplemental Design, Installation and Maintenance Requirements
1. The design of the alternative or emerging energy facility shall conform to applicable industry standards, including those of the American National Standards Institute, National Underwriters Laboratories, ASTM, National Electric Code, or other pertinent certifying organization, in addition to the Uniform Construction Code [Chapter 5, Part 1], and/or other pertinent codes adopted by Solebury Township. The manufacturer specifications shall be submitted as part of the permit application.

2. Maintenance. The landowner is responsible for maintaining the system in a safe and operable condition for the life of the system. It shall be the responsibility of the property owner maintain the system in operable condition unless the intent is to decommission the system in accordance with Section 27-3209 of this Part.

3. Above-ground alternative and emerging systems shall not display advertising, except for reasonable identification of the manufacturer.

4. On-site transmission, distribution, and power lines between an alternative and an emerging energy facility and the structure utilizing the energy shall be placed underground.

5. Above-ground alternative and emerging energy systems shall not be combined with other support towers or accessory structural components that are devoted to, or utilized by, public or private utilities.